+86 0371 8654 9132

methodology of wet mix macadam road specification

What is wet mix macadam (wmm) in Road Construction

Jan 12, 2021 · Equipment or tools for for Wet Mix Macadam Construction. The following equipment shall be carried out for the WMM. 1. Wet Mix Macadam Plant. 2. Dumper / Tippers. 3. Vibro Roller (80 to 100 KN) 4. Water Tanker. 5. Paver capable of paving more than 9 meter width. 6. Survey kit / instrument. Method of wet mix macadam (wmm) in Road Construction

METHODOLOGY FOR WET MIX MACADAM – HIGHWAY GUIDE

Wet mix Macadam shall be prepared in an approved WMM mixing plant having provision for controlled addition of water and forced/positive mixing arrangement. Optimum moisture for mixing shall be determined in accordance with IS: 2720 (Part 8) after replacing the aggregate fraction retained on 22.4 mm sieve with materials of passing from 22.4 and ...

METHODOLOGY FOR CONSTRUCTION OF WET MIX MACADAM

Method Statement For Construction of Wet Mix Macadam 1.1 General This method describes the laying of Wet Mix Macadam over prepared GSB as per drawing and Technical Specification No. 406 from Km 164.500 to Km 200.000 1.2 Temporary Works Road diversion, drainage diversion etc shall be done as per site requirements. 1.3 Surveys i.

Construction Methodology of Wet Mix Macadam(WMM) - CivilYard

May 18, 2021 · Construction Methodology of Wet Mix Macadam (WMM) This work shall consist of laying spreading and compacting clean, crushed, graded aggregate and granular material, pre-mixed with water, to a dense mass on prepared and approved granular sub-base in accordance with clause 406 of MORT&H specification. Wet Mix Macadam is also known as “John ...

Specification for Road Works Series 800 - Road Pavements ...

Specification for Road Works Series 800 - Road Pavements - Unbound and Cement Bound Mixtures CC-SPW-00800 ... (Wet Mix Macadam) ... 814 Mix-in-Plant Method of Construction Using Batching by Mass 815 Mix-in-Plant Method of Construction Using Volume Batching ...

Wet Mix Macadam Construction And Quality Control ...

The aggregate for Wet Mix Macadam shall conform to requirements specified in the Table 400-10 of MORTH & Technical Specifications. 1. 40 % (Max.) 2. 30% (Max.) If the water absorption of the coarse aggregate is greater than 2.0%, the soundness test shall be carried out on the material as per IS: 2386 (Part-5). A mix of crushed stone and ...

Depth of Overlay on Roads - ROADEX Network

clause 806 (wet mix macadam) 28 appendix d: provisional specification for stabilised wet-mix macadam 35 appendix e: table 1: bs 4987: part 2: 1993, specified nominal and minimum layer thicknesses for coated macadam 41 appendix f: engineering standards for overlay works on non national roads

All About Wet Mix Macadam- Kaushik Engineering Works

Jul 13, 2018 · While constructing a road, there needs to lay down the base course material right before hot mix asphalt is laid, and that process done through the Wet Mix Macadam. The materials used for the sub-base, base or existing pavement are prepared in a plant as per the specifications provided.

IRC 109: Guidelines for Wet Mix Macadam : Indian Roads ...

Name of Standards Organization: Indian Roads Congress (IRC) Designator of Legally Binding Document: IRC 109 Title of Legally Binding Document: Guidelines for Wet Mix Macadam LEGALLY BINDING DOCUMENT Step Out From the Old to the New--Jawaharlal Nehru Invent a new India using knowledge.--Satyanarayan Gangaram Pitroda. Translations.

Works 4 Space: Construction Methodology of Wet Mix Macadam

Sep 15, 2019 · 4. SCOPE OF WORK: The work shall consist of laying and compacting well graded aggregate & granular material premixed with water on prepared granular sub-base for widening/new construction of carriageway, hard shoulders and service roads. The thickness of a single compacted wet mix macadam

WMM MIX DESIGN – The Quality Guru

physical properties of wmm material grading requirement for wet mix macadam steps to follow in design mix. indentify the source of material. meet the grading requirement as per morth table 400.13; check the shape of the aggregate. fix the percentage of various componants in the mix (40mm, 20mm,10mm dust).

(PPT) Analysis Specification and Estimate on Road Works ...

• Providing Wet Mix Macadam using crushed stone aggregates as per approved Drawing & Technical Specifications and as per Clause -406 of MoSRT&H Specifications for Road

Specification for Bituminous Macadam

2.1 This specification deals with the basic outline for the design, construction and controls needed while laying bituminous macadam course for highways. 2.2 Bituminous macadam (BM) shall consist of mineral aggregate and appropriate binder, mixed in a hot mix plant and laid with a mechanized paver. It is an

Wet Mix Macadam (WMM) technical specifications as per ...

Apr 02, 2020 · If wet mix macadam (WMM)/ Water Bound Macadam (WBM) is to be laid directly over the sub- grade, without any other intervening pavements course, a 25 mm course of screening (Grading B)or coarse sand shall be spread on the prepared sub-grade.it is advisable to lay 100 mm insulated layer of screening or coarse sand on the top of fine grained soil.

(DOC) Construction of Cement Stabilized Roads | Rakesh ...

Wet Mix Macadam Bituminou is designed s Layer as per requiremen Two layers t of of MORTH bituminous specificatio were ns. The designed coarse and over laying fine on WMM aggregate layer viz. were Dense mixed Bituminou proportion s Macadam ally to (DBM) and arrive at Bituminou the design s Concrete mix.

Method Statement for Placement of Sub Base and Road Base ...

The purpose of this roadworks method statement is to describe the activities, sequence and methods that are mandatory for carrying out the standard placement of subbase and roadbase for a project. The sequence of the road work activities shall remain in three stages i.e. placing of lower sub base, placing of upper sub base and finally placement of road base and wet mix macadam.

IRC method of design of exible pavements

CHAPTER 28. IRC METHOD OF DESIGN OF FLEXIBLE PAVEMENTS NPTEL May 3, 2007 (WBM) or wet mix macadam (WMM) or equivalent con rming to MOST speci cations. The materials should be of good quality with minimum thickness of 225 mm for tra c up to 2 msa an 150 mm for tra c exceeding 2 msa. Bituminous surfacing

What is the difference between WBM and WMM with respect to ...

Water bound macadam roads(WBM): Aggregates are placed one over the other and binded them in the presence of water. SO it is called water bound and macadam is the name of civil engineer who found that inferior material should be at bottom and super...

SECTION-7: BILL OF QUANTITIES

The method of measurement of completed work for payment shall be in accordance with ... MORTH Specification . Specifications for Road and Bridge Works (4th revision) issued by the Ministry of Roads ... water bound macadam/ wet mix macadam complete as per Technical Specifications Clause 510 . b) Second Coat Surface Dressing .

IRC:109-2015

GUIDELINES FOR WET MIX MACADAM 1 INTRODUCTION. The Indian Roads Congress published the Guidelines for Wet Mix Macadam in 1997. This document served the profession well for about two decade. Taking note of the technological . development and performance experience, the Flexible Pavement Committee (H-2) felt the

Methodology Archives - CivilYard

May 22, 2021 · Construction Methodology of Wet Mix Macadam(WMM) This work shall consist of laying spreading and compacting clean, crushed, graded aggregate and granular material, pre-mixed with water, to a dense mass on prepared and approved granular sub-base in accordance with clause 406...

METHOD STATEMENT FOR DENSE BITUMINOUS MACADAM

Jun 02, 2020 · This work shall consist of laying in a single course a 50 to 100 mm – thick layer of DBM on a previously primed and approved Wet Mix Macadam Layer, as per specified lines & grades and in accordance with clause 507 of MORT&H specification or project specification.

Macadam - Wikipedia

Macadam is a type of road construction, pioneered by Scottish engineer John Loudon McAdam around 1820, in which single-sized crushed stone layers of small angular stones are placed in shallow lifts and compacted thoroughly. A binding layer of stone dust (crushed stone from the original material) may form; it may also, after rolling, be covered with a binder to keep dust and stones together.

Application of Value Engineering Methodology to Roads

It is not a part of the normal design process, but a formal ... Wet mix macadam road base AC Wearing course AC Base Course Block paving (60mm & 80mm) Up stand kerb / heel kerb ... Aggregate Base Course Wet Mix Macadam Structure No. 0.14 High Cost Construction methodology –Quicker

Method Statement For Roadbase Construction | PDF | Road ...

METHOD STATEMENT. SUB-BASE AND ROAD-BASE. 2.3 Placing of Road Base or Wet Mix Macadam 2.3.1 The material shall be laid using an approved machineries and compacted in layers in accordance with specification.

STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE WORKS

1208 wet mix macadam base and subbase 12-21 section 1300 – bituminous surface and base course page no 1301 general requirements for bituminous pavement layers 13-1 1302 prime coat and tack coat 13-13 1303 surface dressing 13-17 1304 penetration macadam, semi-grout 13-28 1305 sand seal 13-32 1306 slurry seal 13-34 1307 bituminous macadam 13-37

Construction Scheme & Methodology for Road & Drain works ...

Apr 05, 2020 · CONSTRUCTION SCHEME AND METHODOLOGY FOR ROAD AND DRAIN WORKS: GENERAL. ... The mix design for Wet Mix Macadam shall be carried out and the successful combination that complies with the specification requirements shall be submitted for approval of employer’s representative. Upon erection of the wet mix plant and the mobilization of paving team ...

Wet Mix Macadam (WMM) technical specifications as per ...

Apr 02, 2020 · If wet mix macadam (WMM)/ Water Bound Macadam (WBM) is to be laid directly over the sub- grade, without any other intervening pavements course, a 25 mm course of screening (Grading B)or coarse sand shall be spread on the prepared sub-grade.it is advisable to lay 100 mm insulated layer of screening or coarse sand on the top of fine grained soil.

SUB-BASE AND ROAD-BASE - Method Statement HQ

METHOD STATEMENT SUB-BASE AND ROAD-BASE Ref. No. : 02/11/MC/14/00-01 Revision No. : 1.0 Revision Date : 1/11/2002 2.3 Placing of Road Base or Wet Mix Macadam 2.3.1 The material shall be laid using an approved machineries and compacted in layers in accordance with specification

EXPERIMENTAL STUDY ON COMPOSITE LAYERS OF GSB-II

sub base and wet mix macadam material it is found that by AASHTO method of design, overall pavement thickness can be reduced. Hence cost of flexible pavement decreases. New technology of Cement treated granular sub base/base is used to reduce the overall pavement thickness compared to normal and composite layer

IRC method of design of exible pavements

CHAPTER 28. IRC METHOD OF DESIGN OF FLEXIBLE PAVEMENTS NPTEL May 3, 2007 (WBM) or wet mix macadam (WMM) or equivalent con rming to MOST speci cations. The materials should be of good quality with minimum thickness of 225 mm for tra c up to 2 msa an 150 mm for tra c exceeding 2 msa. Bituminous surfacing

Water Bound Macadam Specification

Water Bound Macadam Specification Types of Bitumen Mixes for Pavements ... water bound macadam WBM or a wet mixed Macadam WMM APPENDIX I Draft COLTO format specification for April 18th, 2019 - APPENDIX I Draft COLTO format ... methods quora, road pocket book 1 2 11 for engineers ...

WET MIX MACADAM PLANT – Royal Industries

Conforming to international standards the WMM range of Wet Mix Plants also conforms fully to the latest MORTH (Ministry of Road Transport & Highway) specification. The Royal Wet Mix Plants has a class engineered to last, Standard Make Bought outs, precision engineering, quality processes and procedures with Royal’s rich experience ensure the ...

AASHTO Pavement Thickness Design Guide - CECALC

basis for the pavement design. 2. Design variables a. Analysis period (n) – n is the period of time for which the analysis is to be conducted. Normally 50 years for concrete and 30 years for asphalt. b. Design Traffic (ESALs) – ESALs is the estimate of number of Equivalent 18 kip Single Axle

SECTION-7: BILL OF QUANTITIES

The method of measurement of completed work for payment shall be in accordance with ... MORTH Specification . Specifications for Road and Bridge Works (4th revision) issued by the Ministry of Roads ... water bound macadam/ wet mix macadam complete as per Technical Specifications Clause 510 . b) Second Coat Surface Dressing .

FINAL REPORT - SlideShare

May 25, 2015 · The travelling plant is a smaller unit and can be shifted from time to time along the road side as the bituminous construction progresses. 3.1 HOT-MIX METHOD In hot mix constructions the heated aggregates are mixed with heated bitumen in a central or travelling plant. 3.2 COLD-MIX METHOD In cold mix method, the aggregates at atmospheric ...

Steps in Bituminous Road Construction - The Constructor

🕑 Reading time: 1 minuteBitumen road construction consists of various steps such as preparation of base course, application of bituminous coat, placement of bituminous mix, rolling and check for quality etc. which are discussed. Contents:Steps in Bituminous Road Construction1. Preparation of the existing base course layer2. Application of Tuck Coat3. Preparation and placing of Premix4. []